Watch this module
Module 2 of the video course. The article below covers the same ground in written form, so you can watch, read, or both.
Open next week's calendar and look at what's already on it: the standup, a review somebody else scheduled, a customer call you got added to, and a recurring block whose whole description is the word "sync." If you lay the product manager's job out as seven columns on one page, the way Pragmatic Institute's framework does, most of those meetings belong to one column, planning, and forty hours won't stretch across seven. The hours you leave undecided go to whichever column is loudest that week.
For anyone who hasn't seen part one, the columns run left to right. Market, focus and business ask which problems customers have, who to build for, and whether any of it makes money. Planning decides what gets built. Programs, readiness and support launch it, sell it, and show up in person for customers and prospects.
Neil McElroy faced the people side of this problem at Procter & Gamble in 1931. His memo, the one most often cited as the start of brand management, described a job a lot like this one, set out the work "as we will have it when we have sufficient man power," and asked for more people to do it.
Fieldstone's first calendar
Take a made-up software company I'll call Fieldstone: about 15 people building tools for small heating and plumbing contractors, whose technicians photograph every job on their phones so the office can quote, invoice and settle arguments about damage. Fieldstone hasn't shipped. It has pilot customers, a founder who runs the sales demos, and no salesperson.
By the end of her first week, its first product manager had 20 sticky notes sorted into those seven columns on her wall. Eighteen landed in planning. Two landed in support: the founder's Tuesday demo for a prospect, and a pilot customer upset about a missing line on the invoice. Market, focus, business, programs and readiness had nothing on them.
Her calendar for next week matches the wall. About 30 of her 40 hours already belong to planning, between the standup, the backlog reviews, engineering's questions and the meetings that grow up around them, and overhead fills the rest. Each of those planning hours arrived as a request from somebody waiting on her, and nobody was waiting on her in the five bare columns.
Splitting the week evenly wouldn't fix the bare columns. Seven columns into forty hours gives each one under six hours, too few to do any of them well, and the split wouldn't last past Wednesday, when engineering would have a question that blocks their work and planning would take the other columns' hours back one interruption at a time.
Why the urgent question wins
Engineering's Wednesday question wins because it's urgent. A team led by Meng Zhu at Johns Hopkins published experiments in 2018 in which people kept choosing an urgent task over a more important one with a bigger payoff, even when the deadline left them plenty of time. Zhu's team called it the mere urgency effect. According to the Johns Hopkins summary of the study, the effect shrank when people were reminded of the payoffs at the moment they chose.
Those experiments tested one choice at a time, and a working week holds hundreds of them, Applied to a week, the finding suggests deciding which columns get your hours before Monday's requests arrive, while the payoff of each one is still in plain view and nothing is shouting yet.
Packages of emphasis
Deciding ahead means some columns get less, and Steve Jobs once had to defend that kind of choice on a stage in June 2010. Walt Mossberg was interviewing him at the D8 conference and pressing him on why Apple wouldn't allow Adobe's Flash on the iPad. Jobs said Apple didn't have the resources to back every technology, so it chose which ones to bet on. Mossberg then asked what Apple would do if people called the iPad crippled without Flash, and Jobs answered:
"Things are packages of emphasis. Some things are emphasized in a product. Some things are not done as well in a product. Some things are chosen not to be done at all in a product."
Apple, he said, would leave Flash out and "take the heat."
Jobs was talking about a product, and two of his three categories still carry straight over to a product manager's wall: some columns deserve the emphasis, and some deserve a smaller version of the work. His third category, "chosen not to be done at all," is where a job parts ways with a product. The work in every column keeps arriving whether anyone looks or not. Contractors keep having problems whether anyone studies them, and once Fieldstone ships, somebody has to sell the product and show up for its customers.
Three marks
So Fieldstone's product manager marks each column to say which, using three marks: Jobs's first two categories become Own and Light, and his third becomes Later, a deferral that carries a written trigger.
Own, Light, Later - Own: real hours every week, and you do the work yourself. On the calendar it's a big block, and when a meeting request lands on it, the meeting moves. - Light: a small, fixed block on the calendar every week, set before the week starts. In it you do just enough of the column's work to know what's going on there. - Later: none of your hours for now, plus a trigger: a sentence that starts with "when" and names the event that brings the column back. Write the mark and the trigger on the wall, where the people around you can see them.
The trigger works best as an event, like a hire or a customer count, because events are what change how much work a column needs. A date brings the column back on schedule whether anything changed or not.
Stage and size
The right marks depend on the company's stage, starting with whether it has shipped. Before you ship, there's nothing to launch yet, no salesperson, and nobody to support beyond a handful of pilot customers, so what a product manager learns in market, focus and business shapes what gets built, and those columns are where her hours earn the most. After launch the hours move to the right-hand columns: programs needs real time for the launch, readiness needs material for the first salespeople, and support needs someone to show up for customers in person. The company's size decides how far they move. At 2,000 people, marketing may already run launches and a sales team may build its own material, so a product manager there can keep programs and readiness Light even after launch. At Fieldstone, with 15 people, there's nobody else to do that work.
Marking Fieldstone
Fieldstone has 15 people and hasn't shipped, so its product manager starts at the far left. Market is Own, about 14 hours a week, because nobody else there is going to find out which problems contractors have and whether they'd pay to make them go away, and every column to the right depends on the answer. Focus is Light, about an hour a week, spent keeping a written list of who's asking for what: the fifty-truck company wants dispatch scheduling, the two-person shop wants the app simpler, and for now she records both requests without choosing between them. Business is her other Own, about 8 hours a week, because somebody has to work out whether Fieldstone charges by the technician or by the job, and what storing all those photos will cost, before the product gets built around a guess.
Planning, with 18 of her 20 sticky notes on it and engineering waiting on most of them, gets marked Light anyway. The engineering lead puts the backlog items in order, runs the backlog reviews and decides how each one gets built. She keeps the daily standup short, saves engineering's questions for two fixed blocks a week, and uses those blocks to write what each backlog item is for and why a contractor needs it. Planning drops from about 30 of her hours to about 4.
Programs is Light too, an hour a week. There's nothing to launch yet, so the hour goes to a running list of what launch will need, starting with updating the website, which still describes the pilot.
Readiness and support are both Later. Readiness is the material a seller needs to sell without her, and with no seller at Fieldstone yet, the trigger under that column reads when we hire the first salesperson. Support has the two notes on it, but the founder keeps running the Tuesday demos and handling the upset pilot customer, and the missing invoice line goes onto the backlog. Its trigger reads when we sign the tenth paying customer, a number Fieldstone picked for itself: past ten, the demos and the visits to unhappy customers will be more than one founder can carry.
Her calendar for next week now opens with the two Own columns, about 22 hours between them, with planning's 4 hours and an hour each for focus and programs around them. That's 28 hours. The other 12 or so go to overhead (the all-hands, email and whatever breaks midweek), budgeted in advance, so a busy Wednesday uses them up before it gets anywhere near market.
The first test
Midweek, the founder asks Fieldstone's product manager for a one-page sales sheet to hand next Tuesday's prospect. A sales sheet sells when nobody from Fieldstone is in the room, which makes it readiness work, and readiness is marked Later. Her answer is the trigger on the wall: the sheet waits for the first salesperson, and until then the founder makes the case in person at every demo. Writing it now would also take hours from market, and market is where she'll learn which problem the sheet should lead with.
Mark your columns
Draw the seven columns for your job if you haven't already. Mark each one Own, Light or Later for your company today, given its size and whether it has shipped, and then check the marks against three rules:
- 1. Mark two columns Own, three at the very most. Fieldstone's two already take 22 hours of her week, which is why she stopped at two.
- 2. Give every Light column its block on next week's calendar, with a note of the work that goes in it, like her list of who's asking for what.
- 3. Give every Later column a trigger that starts with "when," and if someone else covers that column in the meantime, write their name beside it.
Put the blocks on next week's calendar before Monday's requests show up. The first meeting invite that lands on an Own block will tell you whether you meant it.
This is part two of the 14-part The Product Manager's Guide to Getting Sh\*t Done on YouTube. In part three, Fieldstone's product manager takes her first Own column out of the building and into contractors' trucks and offices. If this was useful, subscribe there.
Get the next guide
ISO 13485, IEC 60601, and the GHG Protocol are in the queue. Leave your email and each new guide lands in your inbox the day it ships. Nothing else, no drip sequence.
Done. You’ll get the next guide when it ships.
The course is free. If your company needs someone to run product while you build the team, that’s the work I do.
Work With DavePrefer a smaller first step? Book a $500 one-hour working session →
Dave Saunders is the founder of Base Reality Group and a Fractional CPO for product companies. He was a founder and operator at Galen Robotics, where the surgical-robotics platform earned FDA De Novo authorization in 2023, and he managed a 35-patent portfolio licensed from Johns Hopkins. He wrote Founders Who Finish and publishes The Build. More about Dave →